Inside Tecta

NATIONAL MUSEUM OF THE US ARMY

    PROJECT DETAILS:  The National Museum of the United States Army Celebrates over 245 years of army history and honors our nation’s soldiers —Past, Present and Future —the regular Army, the Army Reserve, and the Army National Guard. The layout and installation of the framing systems included insulation and stainless steel wall panel cladding […]
ARMY MUSEUM 1 B-03 (1)
ARMY MUSEUM 2 B-03 (1) 22
ARMY MUSEUM 2 B-03 (1) 22
Arch-Metals-Army-Museum1
previous arrow
next arrow

 

 

PROJECT DETAILS:

 The National Museum of the United States Army Celebrates over 245 years of army history and honors
our nation’s soldiers —Past, Present and Future —the regular Army, the Army Reserve, and the Army
National Guard.

  • The layout and installation of the framing systems included insulation and stainless steel wall panel
    cladding on six structures.
  • Washington Building Congress Craftsmanship Award 2019

Operating Unit:

Architectural Metals

Client:

    Clark Construction

Industry Type:

    Government / Federal

Project Type:

    New Construction

Location:

    Fort Belvoir, VA

Square Footage:

    121,000

Systems Installed:

    Stainless Steel Rain Screen Wall Cladding System

CONTACT INFO:

342 Commerce Drive, Glen Rock, PA 17327   717-428-7448    bmcclelland@tectaamerica.com

Facebook
Instagram
LinkedIn
YouTube