West Seaford Elementary School
- Posted by: Tecta America
- Category:
jQuery(document).ready(function($) { "use strict"; var slick_1576012742 = $("#image_carousel-1576012742"); slick_1576012742.slick({ infinite: true, adaptiveHeight: true, prevArrow: "", nextArrow: "", cssEase: "cubic-bezier(0.455, 0.030, 0.515, 0.955)" }); }); PROJECT DETAILS We removed an existing multi-layer built-up roof system. A new modified bitumen roof systems were installed with tapered insulation. It was completed with a flood coat and gravel. PROJECT DETAILS Operating Unit:
University of Maryland Eastern Shore
- Posted by: Tecta America
- Category:
jQuery(document).ready(function($) { "use strict"; var slick_650174188 = $("#image_carousel-650174188"); slick_650174188.slick({ infinite: true, adaptiveHeight: true, prevArrow: "", nextArrow: "", cssEase: "cubic-bezier(0.455, 0.030, 0.515, 0.955)" }); }); GENERAL CONSTRUCTION This new construction project consists of both formed and composite metal wall panels, standing seam metal roof system, slate roof system, TPO roof system with tapered insulation, roof pavers
Seaford Central Elementary School
- Posted by: Tecta America
- Category:
jQuery(document).ready(function($) { "use strict"; var slick_2042707941 = $("#image_carousel-2042707941"); slick_2042707941.slick({ infinite: true, adaptiveHeight: true, prevArrow: "", nextArrow: "", cssEase: "cubic-bezier(0.455, 0.030, 0.515, 0.955)" }); }); ABOUT SEAFORD CENTRAL ELEMENTARY Seaford Central is a school for Kindergarten to 4th grade located in Seaford, Delaware. The vision of Central Elementary is to lay a solid foundation with students,
Salisbury University
- Posted by: Tecta America
- Category:
jQuery(document).ready(function($) { "use strict"; var slick_290083433 = $("#image_carousel-290083433"); slick_290083433.slick({ infinite: true, adaptiveHeight: true, prevArrow: "", nextArrow: "", cssEase: "cubic-bezier(0.455, 0.030, 0.515, 0.955)" }); }); GENERAL CONSTRUCTION The project consisted of removing the existing built-up roof system and installation of new modified bitumen roof system. A roof hatch was installed alongside new gutters and downspouts that
Frederick Douglas Elementary School
- Posted by: Tecta America
- Category:
jQuery(document).ready(function($) { "use strict"; var slick_1270116963 = $("#image_carousel-1270116963"); slick_1270116963.slick({ infinite: true, adaptiveHeight: true, prevArrow: "", nextArrow: "", cssEase: "cubic-bezier(0.455, 0.030, 0.515, 0.955)" }); }); GENERAL CONSTRUCTION The existing multi-layer built-up roofy system was removed and replaced with a new modified bitumen roof system with tapered insulation. The job was completed with a flood coated with gravel.
Delmar Elementary School
- Posted by: Tecta America
- Category:
jQuery(document).ready(function($) { "use strict"; var slick_1483415258 = $("#image_carousel-1483415258"); slick_1483415258.slick({ infinite: true, adaptiveHeight: true, prevArrow: "", nextArrow: "", cssEase: "cubic-bezier(0.455, 0.030, 0.515, 0.955)" }); }); PROJECT DETAILS This project consisted of removing the existing built-up roof system and installing an insulated sleeper system with standing seam metal panels, complete with gutters and downspouts. PROJECT DETAILS Operating
Belmont Towers Condominium
- Posted by: Tecta America
- Category:
jQuery(document).ready(function($) { "use strict"; var slick_2131444977 = $("#image_carousel-2131444977"); slick_2131444977.slick({ infinite: true, adaptiveHeight: true, prevArrow: "", nextArrow: "", cssEase: "cubic-bezier(0.455, 0.030, 0.515, 0.955)" }); }); PROJECT DETAILS New construction job with the installation of a two-ply Siplast Modified Bitumen Roof System on the flat areas with tapered ISO insulation. Pavers were installed on private balconies to create
Avalon Condominium Sun Deck
- Posted by: Tecta America
- Category:
jQuery(document).ready(function($) { "use strict"; var slick_565149128 = $("#image_carousel-565149128"); slick_565149128.slick({ infinite: true, adaptiveHeight: true, prevArrow: "", nextArrow: "", cssEase: "cubic-bezier(0.455, 0.030, 0.515, 0.955)" }); }); PROJECT DETAILS Removal of existing ceramic tiles and thin-set mortar. Removal of EIFS at parapet walls. Installation of new Siplast Terapro Reinforced PMMA Liquid-Applied Waterproofing System. The system was properly flashed