-
Sioux Falls Federal Credit Union
- Posted by: Tecta America
- Category:
jQuery(document).ready(function($) { "use strict"; var slick_1496830504 = $("#image_carousel-1496830504"); slick_1496830504.slick({ infinite: true, adaptiveHeight: true, prevArrow: "", nextArrow: "", cssEase: "cubic-bezier(0.455, 0.030, 0.515, 0.955)" }); }); Project Details: The two small towers consisted of a 60 mil adhered EPDM on top of gypsum board, tapered polyisocyanurate, and densdeck prime. The standing seam panels system was fabricated and
-
SDSU Dykhouse Stadium
- Posted by: Tecta America
- Category:
jQuery(document).ready(function($) { "use strict"; var slick_1103128286 = $("#image_carousel-1103128286"); slick_1103128286.slick({ infinite: true, adaptiveHeight: true, prevArrow: "", nextArrow: "", cssEase: "cubic-bezier(0.455, 0.030, 0.515, 0.955)" }); }); Project Details: The roof system on this project is a 60 mil adhered white EPDM with polyisocyanurate and densdeck prime insulation. Insulated wall panels were used on the majority of the
-
SDSU Alumni Center
- Posted by: Tecta America
- Category:
jQuery(document).ready(function($) { "use strict"; var slick_1422091269 = $("#image_carousel-1422091269"); slick_1422091269.slick({ infinite: true, adaptiveHeight: true, prevArrow: "", nextArrow: "", cssEase: "cubic-bezier(0.455, 0.030, 0.515, 0.955)" }); }); Project Details: On this project, we installed a 60 mil adhered EPDM roof system with densdeck prime and polyisocyanureate insulation. We install prefinished metal soffit panels at a side entrance. We
-
Sanford Children’s Hospital
- Posted by: Tecta America
- Category:
jQuery(document).ready(function($) { "use strict"; var slick_24072216 = $("#image_carousel-24072216"); slick_24072216.slick({ infinite: true, adaptiveHeight: true, prevArrow: "", nextArrow: "", cssEase: "cubic-bezier(0.455, 0.030, 0.515, 0.955)" }); }); PROJECT DETAILS Operating Unit: ARS Completion Date: 02/10/2009 Industry Type Health Care Project Type New Construction Location: Sioux Falls, SD Square Footage: 39,823 System Installed: Roofing System, Plate Aluminum Panels, Standing
-
Montgomery Furniture Expansion
- Posted by: Tecta America
- Category:
jQuery(document).ready(function($) { "use strict"; var slick_573078211 = $("#image_carousel-573078211"); slick_573078211.slick({ infinite: true, adaptiveHeight: true, prevArrow: "", nextArrow: "", cssEase: "cubic-bezier(0.455, 0.030, 0.515, 0.955)" }); }); Project Details: Over the existing building, we installed a retrofit TPO roof system with polyisocyanurate flute fill 1.5” polyisocyanurate and a White TPO roof system. Over the new roof areas, we
-
Grand Falls Casino & Resort
- Posted by: Tecta America
- Category:
jQuery(document).ready(function($) { "use strict"; var slick_1124371950 = $("#image_carousel-1124371950"); slick_1124371950.slick({ infinite: true, adaptiveHeight: true, prevArrow: "", nextArrow: "", cssEase: "cubic-bezier(0.455, 0.030, 0.515, 0.955)" }); }); Project Details: EPDM roof system was both 45 mil ballasted EPDM and 60 mil adhered EPDM. The many roofs on this project were made up of various insulation assemblies and thicknesses.
-
Sioux Falls Coliseum
- Posted by: Tecta America
- Category:
jQuery(document).ready(function($) { "use strict"; var slick_436980438 = $("#image_carousel-436980438"); slick_436980438.slick({ infinite: true, adaptiveHeight: true, prevArrow: "", nextArrow: "", cssEase: "cubic-bezier(0.455, 0.030, 0.515, 0.955)" }); }); PROJECT DETAILS Operating Unit: ARS Completion Date: 2010 Industry Type Public Project Type Remodel Location: Sioux Falls, SD System Installed: Custom Fabricated Sheet Metal ARS Homepage ARS, A Tecta America Commercial
-
Children’s Museum of South Dakota
- Posted by: Tecta America
- Category:
jQuery(document).ready(function($) { "use strict"; var slick_790369397 = $("#image_carousel-790369397"); slick_790369397.slick({ infinite: true, adaptiveHeight: true, prevArrow: "", nextArrow: "", cssEase: "cubic-bezier(0.455, 0.030, 0.515, 0.955)" }); }); Project Details: We installed a 60 Mil adhered TPO roof system on this project with the following assembly: vapor barrier, DensDeck, and tapered polyisocyanurate. Flat Lock wall panels were used to
-
Bel Brands Office Facility
- Posted by: Tecta America
- Category:
jQuery(document).ready(function($) { "use strict"; var slick_67621460 = $("#image_carousel-67621460"); slick_67621460.slick({ infinite: true, adaptiveHeight: true, prevArrow: "", nextArrow: "", cssEase: "cubic-bezier(0.455, 0.030, 0.515, 0.955)" }); }); Project Details: We installed a 60 mil adhered white EPDM roof system. We started with a 6 mil poly vapor barrier, tapered polyisocyanurate and DensDeck Prime. We installed a UC-601 corrugated
-
Avera Cancer Institute
- Posted by: Tecta America
- Category:
jQuery(document).ready(function($) { "use strict"; var slick_570090183 = $("#image_carousel-570090183"); slick_570090183.slick({ infinite: true, adaptiveHeight: true, prevArrow: "", nextArrow: "", cssEase: "cubic-bezier(0.455, 0.030, 0.515, 0.955)" }); }); Project Details: We installed an adhered 60 Mil TPO roof system on this project, with a tapered insulation system consisting of: 725TR Air & Vapor Barrier, Tapered ISO, and DensDeck Prime.