PROJECT DETAILS:
Project consisted of removing the existing Ballasted EPDM Roof System and insulation down to the structural metal deck. Install a 60 mil Adhered EPDM Roof System, over ¼” Securock Orange, over Tapered ISO Insulation System, over ½” Securock, over V-Force Vapor Barrier, over Metal Deck. Also installed new 24 Gauge Pre-finished Galvanized Metal Coping Cap and Drip Edge Metal at the roof perimeter details.
PROJECT DETAILS
Operating Unit: | Tecta America Dakotas |
---|---|
Client: | Scheels All Sports - Corporate |
INDUSTRY TYPE: | Private Business |
Project Type: | Roof Replacement |
Location: | Fargo, North Dakota |
Square Footage: | 60,700 |
Systems Installed: | 60 Mil Adhered EPDM |