Hess

PROJECT DETAILS:

The project consisted of installing one layer of 1-1/2” Flute ISO Insulation between each existing standing seam flute. One layer of 1-1/2” ISO Insulation, and one layer of 5/8” CDX Plywood was installed over the existing standing seam metal panels. Directly over the 5/8” CDX Plywood one layer of Firestone Clad Gard Ice Water was installed. Once the insulation, plywood, and ice and water shield was installed, Tecta Dakota’s installed Firestone 24 Gauge Prefinished Galvanized Metal UC-14 Standing Seam Roof Panels. Tecta Dakota’s also fabricated and installed all the associated 24 Gauge Prefinished Galvanized Metal trim.

PROJECT DETAILS

Operating Unit: Tecta America Dakotas
Client: Hess
INDUSTRY TYPE:
Project Type: Roof Replacement
Location: Tioga, North Dakota
Square Footage: 3,300
Systems Installed: Firestone 24 Gauge UC-14 Standing Seam Roof Panels
image_pdfimage_print