Traffic Operations Division Facility

PROJECT DETAILS

The project was a new construction project installing an 80 mil fully adhered TPO system

  • Mechanically attach one layer of insulation
  • Install a fully adhered white TPO (80-mil membrane)
  • Install walkway pads
  • Furnish and install shop fabricated 24-gauge prefinished steel counter-flashings, coping caps, scuppers, collector heads and downspouts
  • Furnish and install 24-gauge prefinished metal roofing and related trim
  • Furnish and install one aluminum roof hatch with a ladder-up safety post

PROJECT DETAILS

Operating Unit: CEI Roofing Texas, LLC
Client: Pepper-Lawson Construction, L.P.
Industry Type: Municipal
Project Type: New Construction
Location: Houston, TX
Square Footage: 44,753
Systems Installed: Single ply – TPO – 80mil fully adhered