SDSU Dykhouse Stadium

Project Details:

  • The roof system on this project is a 60 mil adhered white EPDM with polyisocyanurate and densdeck prime insulation.
  • Insulated wall panels were used on the majority of the exterior walls of the stadium to add style and insulation value to the facility.
  • Corrugated panels along with prefinished soffit panels were used to complete the look of this building.

PROJECT DETAILS

Operating Unit: ARS
General Contractor: Journey Construction
Completion Date: 08/26/2016
Industry Type Public
Project Type New Construction
Location: Brookings, SD
Square Footage: 35,193
System Installed: EPDM Roof System, Corrugated Wall Panels, Insulated Metal Wall Panels, Soffit Panels, ACM Composite Material
image_pdfimage_print