SDSU Alumni Center

Project Details:

  • On this project, we installed a 60 mil adhered EPDM roof system with densdeck prime and polyisocyanureate insulation.
  • We install prefinished metal soffit panels at a side entrance.
  • We installed insulated metal wall panels on the exterior walls of the building.
  • ACM composite panels were custom painted and fabricated to match the insulated wall panels, with tapered soffit panels to compliment the radius design.

PROJECT DETAILS

Operating Unit: ARS
General Contractor: Journey Construction
Completion Date: 07/05/2017
Industry Type Education
Project Type New Construction
Location: Brookings, SD
Square Footage: 10,521
System Installed: EPDM Roof System, ACM Composite Panels, Insulated Wall Panel, Soffit Panels
image_pdfimage_print